    Client/owner :

    Meraas Development

    Completion date :

    April 2018

    • SHARE PROJECT

    Satwa Zone S

    20
    Contract
    duration (months)

    ABOUT THE BUILD

    The aim of the project is to cater to the full infrastructure requirement of the residential, hotels and mixed-use development coming up in the Satwa area of Dubai. The project is split into two; the Enabling Works, and Road & Infrastructure Works.

    • Enabling Works comprises of Removal of HV/LV cables, street lights etc.
    • li>Road and Infrastructure Works comprises of new HV/LV networks,, street lighting, pumping station etc.

    Trans Gulf Electromechanical LLC is executing the below mentioned scope:

    HVAC

    • Split A/C units – supply, installation with piping
    • Testing and commissioning
    • Duct and accessories
    • Extractor fans and supply fans

    Electrical & ELV Systems

    • MCC panels with PLC
    • Cabling (132kv, 33kv, 11kv)
    • Lighting and small power system
    • Structured cabling (tele and data)
    • Fire alarm system
    • Earthing system and lighting protection
    • Feeder pillar
    • RTU scada
    • Street lighting
    • UPS system

    Plumbing

    • Irrigation system with pumps, piping and accessories
    • Sump pumps with piping and accessories
    • Firefighting system with pumps, piping and accessories
    • Sprinkler system and fire hose reel cabinet
    • FM 200
    • Girder crane
    • Surge analysis