    Client/owner :

    Rani International

    Completion date :

    2013

    • SHARE PROJECT

    Oberoi Centre

    24
    Contract
    duration (months)
    35
    Storey

    ABOUT THE BUILD

    The Oberoi Centre, located in the Business Bay area of Dubai, consists of two towers: a 27-storey hotel tower and a 35-storey office tower. The hotel tower consists of a massive ballroom, four international restaurants, a large swimming pool, seven spa suites and 252 guest suites, in addition to seven board meeting rooms at level 26 and a rooftop restaurant and bar at level 27. The office tower comprises 30 floors of offices with three levels of retail space and four levels of basement parking.

    Trans Gulf Electromechanical LLC provided the complete mechanical, electrical and plumbing services for the tower, including the following:

    HVAC

    • Chilled water pumps
    • Air handling units (AHU's/FAHU's) and fan coil units
    • Close control unit (CCU) and split unit
    • Ventilation and extractor fan
    • Car park ventilation system
    • Chilled water pressurisation unit
    • Automatic/manual chemical dosing system
    • Building management system (BMS)

    Electrical and ELV Systems

    • LV panels
    • Automatic transfer switch (ATS)
    • Busbar
    • UPS
    • Lighting control system
    • Earthing and lightning protection system
    • Fire alarm and voice evacuation system
    • CCTV system
    • IPTV system
    • Room management system

    Plumbing

    • Drainage system/submersible pumps
    • Water supply system
    • Water filtration system/water treatment system
    • LPG system
    • Firefighting system
    • Foam deluge system

    The air conditioning is supplied through Empower’s 3000 TR system

    Project Slider
    Project Slider
    Project Slider
    Project Slider
    geometry
    THE
    FACTS

    Air conditioning is supplied through Empower’s

    3000 TR