• Eid Mubarak! We shall be closed for Eid al-Fitr on the first two days of Shawwal X

     

    Client/owner :

    Mr Abdul Rahim Mohd.

    Completion date :

    2001

    • SHARE PROJECT

    Mercato Shopping Mall

    18
    Contract
    duration (months)

    ABOUT THE BUILD

    Mercato Mall is located in the heart of Jumeirah, and its design emulates the very best of Italian architecture. It hosts a wide variety of local and international retail brands as well as a food court, restaurants and a supermarket. The development is fully air-conditioned and finished to a very high standard.

    Trans Gulf Electromechanical was awarded the complete project and has executed the following works:

    HVAC

    • Chillers and chilled water pumps
    • Air handling unit (AHU/FAHU) and fan coil units
    • Building management system (BMS)

    Electrical and ELV Systems

    • LV panels and control panel for HVAC equipment
    • Fire alarm system
    • CCTV system
    • Security and access control system
    • Lighting control system
    • Aircraft warning light
    • Earthing and lightning protection system
    • Generator
    • Telephones and structured cables
    • MATV and CCTV system
    • Central emergency lighting
    • Public address and music system
    • Power controls for entertainment areas

    Plumbing

    • Drainage (waste and Soil) system
    • Rainwater system
    • Hot and cold water supply system
    • Swimming pool equipment
    • Firefighting and sprinkler protection system

    Total cooling load of the project is 2440 TR and the total electrical load is 3910kW.

    Project Slider
    Project Slider
    Project Slider
    Project Slider
    geometry
    THE
    FACTS

    Air conditioning is supplied through Empower’s

    2,440 TR

    Total electrical load

    3,910kW

  • 电竞注册网址