    Client/owner :

    HH Sheikh Mohammed Bin Rashid Al Maktoum

    Completion date :

    2005

    • SHARE PROJECT

    Madinat Jumeirah – The Arabian Resort Of Dubai

    28
    Contract
    duration (months)
    40
    Restaurants

    ABOUT THE BUILD

    With its wind towers and architecture, Madinat Jumeirah Resort is a recreation of ancient Arabia, and contains two 5-star hotels – Al Qasr and Mina A’Salam. In addition, there are 29 traditional summerhouses in Dar Al Masyaf, 7 Malakiya villas, over 40 restaurants and bars, conference and banqueting facilities including two grand ballrooms, a 1000-seat amphitheatre and a dedicated entertainment centre and multi-purpose venue: Madinat Arena. The facilities are interconnected by 3km of waterways and landscaped gardens.

    The services provided by Trans Gulf included the following:

    HVAC

    • Air conditioning and ventilation systems
    • DX split unit
    • Exhaust fans firefighting and protection systems

    Electrical and ELV Systems

    • LV panel and fire alarm system
    • Power, lighting and telephone system
    • Communication systems and security systems
    • Guest room management system

    Plumbing

    • Drainage (waste and soil), rain water system
    • Water supply system and grey water systems
    • LPG gas

    Total cooling load of the project is 16,000 TR and the total electrical load is 36,800kW.