    Client/owner :

    Landmark Asset Holdings

    Completion date :

    2016

    • SHARE PROJECT

    Landmark Group Headquarters

    26
    Contract
    duration (months)

    ABOUT THE BUILD

    This building comprises of 1 U/G basement (storage tanks & plant room), 3 floors of basement car parking, ground floor (entrance lobby/DG room/substation/security room), 7 podium levels of car parking, 19 floors of offices and 4 roof floors (MEP plant rooms).

    The total built up area is 1,170,000sq ft.

    The scope of work included:

    HVAC

    • Centrifugal chiller, cooling tower, chilled water pumps, condensed water pumps, side stream filtration pump, pressurisation pumps
    • Air handling units (AHU’s/FAHU’s) and fan coil units
    • Kitchen extract ducts/kitchen extract fan
    • Parking ventilation with SA/RA plenums & fans
    • Fan for general extract/toilet extract/ pressurisation/make up air

    Electrical & ELV Systems

    • HV and LV panels
    • Standby generator
    • Fire alarm system and voice evacuation system.
    • Central battery system
    • Lighting control system
    • Public address/background music system
    • CCTV system and building management system
    • Access control system with intercom system
    • Gate barrier system and AV system
    • Turnstile system
    • Earthing and lightning protection system
    • IP-based security system
    • Landscape and facade lighting

    Plumbing

    • Drainage (waste and soil) system
    • Rainwater system
    • Domestic water transfer and booster pump set
    • Pre-action system
    • Fire pump set
    • Firefighting and sprinkler protection system
    • FM 200 system
    • Foam system
    • Water heaters

    The total electrical load is LV-7.5MW and HV-1.6 MW (chiller motors).

    The total cooling load is 2100TR.