    Client/owner :

    Dubai Aviation Engineering

    Completion date :

    Expected in 2015

    • SHARE PROJECT

    Dubai International Airport Expansion Phase III

    24
    Contract
    duration (months)

    ABOUT THE BUILD

    Dubai International Airport Expansion Phase III involves the decommissioning and relocation of existing live services followed by the supply, installation, testing and commissioning of the following:

    Aviation

    • Visual docking guidance systems
    • 400Hz frequency converters and pits, 400Hz cabling
    • Pre-conditioned air units and ducts

    Lighting

    • High mast lighting systems/street lighting/building lighting

    Electrical Power Systems

    • MV substations, MV and LV cabling/LV switchgear
    • Diesel generators of capacity up to 1650kVA
    • Dynamic UPS system for runway substations

    Low Current and Security Systems

    • CCTV and WLAN systems for airport aprons
    • Structured cabling network systems
    • Building management and fire alarm systems
    • SCADA system for electricity and water
    • Gate barrier, bollards

    Mechanical and Plumbing Works

    • Fire and potable water pump stations
    • HVAC systems/firefighting systems/plumbing and drainage
    • 34 tonne chiller installation
    • 300 tonne chiller relocation and refurbishment
    • Decommissioning/relocation of existing live services