• Eid Mubarak! We shall be closed for Eid al-Fitr on the first two days of Shawwal X

     

    Client/owner :

    EMPOWER

    Completion date :

    2014

    • SHARE PROJECT

    District Cooling Plant At Business Bay - Empower

    15
    Contract
    duration (months)

    ABOUT THE BUILD

    The Empower District Cooling Plant (DCP-02) at Business Bay Dubai, will have a proposed built-up area of 101,625 sq ft with a total capacity of 43,750 TR.

    Trans Gulf was responsible for the design and development of engineering drawings, plant and material selection, procurement, installation, commissioning and performance validation of the mechanical and electrical chilled water process plant for the district cooling system at Business Bay.

    The scope of work included the following:

    • Design and construct 1 x 43,750 TR district cooling plant, and 7 x chiller modules of 5000 TR capacity
    • Supply and install 2 x thermal energy storage tanks of 4375 TR capacity each with a total capacity of 43,750 TR
    • Supply and install 13 transformers rated 2000 KVA
    • Supply and install 5 x MV switchgears on the ground floor feeding to 14 chillers of a total load of 23.4MW

    The LV Room contains 13 MDBs to feed power to the building services and 37 VFDs, which are catering to respective equipment such as the primary, secondary and condenser pumps, the makeup water pumps, the cooling towers on the roof and building services at all levels. One backup generator of 315 KVA is provided for maintaining an essential power supply in case of a mains power supply failure.

    Common area lights are controlled by a lighting control system. Exit and emergency lights are connected to a central battery emergency system. The fire alarm system is as per the requirement of Civil Defence Authority. The telephone network connection is from Du and design is as per Du design guidelines. The Low Current System consists of CCTV and an access control system.

    The chilled water circuit comprises eight primary pumps and nine secondary pumps and the condenser circuit comprises eight condenser pumps and eight cooling towers cells on the roof. The chillers are located in the basement, the TES tanks on the ground floor, all pumps on the first floor and the cooling towers on the roof.

    Upon completion the project will provide chilled water to the commercial and showroom buildings, residential buildings and town houses.

    Project Slider
    Project Slider
    Project Slider
    geometry
    THE
    FACTS

    Air conditioning is supplied through Empower’s

    43,750 TR

    Total electrical load

    23.4MW

  • 电竞注册网址