• Eid Mubarak! We shall be closed for Eid al-Fitr on the first two days of Shawwal X

     

    Client/owner :

    Majid Al Futtaim

    Completion date :

    2012

    • SHARE PROJECT

    Arabian Centre

    36
    Contract
    duration (months)

    ABOUT THE BUILD

    Arabian Centre is a premium shopping and entertainment destination located in Al Mizhar, near Mirdif, Dubai. Sporting Arabian architecture with a modern twist, it hosts a wide variety of local and international brands as well as a food court, restaurants, hypermarket and cinemas.

    The scope of works for Trans Gulf Electromechanical included the design, supply, installation and testing/commissioning of the following:

    • Electrical works as below to BS7671
    • HV and LV infrastructure including provision of five new sub stations
    • High voltage and low voltage distribution
    • Connections and control of CHP
    • External and internal lighting
    • Emergency lighting to BS5266 and general power distribution
    • Fire alarm and voice evacuation to BS5839
    • SMATV, lightning protection, standby generators system
    • UPS, public address system, CCTV, data and voice
    • Disabled persons alarm network, external gas, water mains
    • Internal H&CWS distribution, CHW heating and cooling systems
    • Energy recovery ventilation, fire protection – sprinkler and FM200
    • WC extractor systems and above ground drainage
    • Sanitary ware installation

    Project Slider
    Project Slider
    Project Slider
  • 电竞注册网址